[關(guān)鍵詞]龍灘水電站;大壩工程;施工供電線(xiàn)路;電壓等級(jí);同桿雙回路;聯(lián)絡(luò)開(kāi)關(guān)
Abstract]: Longtan Hydropower Station Dam is one of the world's highest roller compacted concrete gravity dam. Dam project required the construction of power supply equipment installed capacity of about 50,000 KVA, the computational load of about 33,000 KW, which is equivalent to a county's electricity load. Due to Longtan Hydropower Station site topography and other reasons, 10 of the Dam Construction of the power supply circuit full adopt dual-circuit wiring of the same pole; Dam Construction of the power supply line has been running for nearly five years, provides a powerful and reliable electricity for dam construction, to meet the needs of the construction of electricity.[Key words]; Longtan Hydropower Station; dam project; construction of power lines; voltage level; with Double-loop; contact switch
中圖分類(lèi)號(hào):TV7文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):
1、工程概況
龍灘工程設(shè)計(jì)總裝機(jī)容量為630萬(wàn)千瓦,水庫(kù)正常蓄水位400米,總庫(kù)容273億立方米,是國(guó)內(nèi)在建的僅次于長(zhǎng)江三峽特大型水電工程。龍灘水電站大壩是碾壓混凝土重力壩,最大壩高216.5米,壩頂長(zhǎng)836.5米,壩體混凝土方量約為730萬(wàn)立方米;于2003年11月截流,2006年9月蓄水,2007年5月第一臺(tái)機(jī)組發(fā)電?;炷聊旮叻鍧仓?00余萬(wàn)立方米,工期緊,工程量大。為保證大壩工程施工,所用的大中型電氣設(shè)備300余臺(tái)(安裝容量達(dá)5.0萬(wàn)KVA,計(jì)算負(fù)荷約3.3萬(wàn)KW)安全運(yùn)行,如何為這些設(shè)備建立一個(gè)完善的安全的供電系統(tǒng),是必須考慮的問(wèn)題。
2、供電線(xiàn)路設(shè)計(jì)方案
2.1電源點(diǎn)
業(yè)主從南丹縣境內(nèi)的車(chē)河設(shè)2回110kV線(xiàn)路至工地,在右岸壩軸線(xiàn)下游800m(高程400.00m)處建立工地110kV施工變電所,安裝2臺(tái)31.5MVA的變壓器。110kV變電所共引出22回線(xiàn)向整個(gè)施工區(qū)供電,其中業(yè)主為大壩工程施工段提供10個(gè)10KV回路接口,右岸施工用電8個(gè)回路直接在110KV變電所接線(xiàn),左岸用電2個(gè)回路從左岸10kV開(kāi)閉所接線(xiàn)。
2.2 大壩工程供電范圍及高峰負(fù)荷
2.2.1施工供電線(xiàn)路供電范圍
混凝土生產(chǎn)系統(tǒng)、大壩基坑開(kāi)挖、圍堰施工、基坑排水、混凝土澆筑、灌漿作業(yè)、下游河道整治等主體工程以及為完成主體工程而配備的纜機(jī)、塔帶機(jī)、塔機(jī)、頂帶機(jī)、供料線(xiàn)、壓氣站、施工機(jī)械修理廠(chǎng)、停放場(chǎng)、加工廠(chǎng)、預(yù)制廠(chǎng)、施工照明等。
2.2.2施工高峰負(fù)荷情況
根據(jù)施工總進(jìn)度、施工布置以及各種設(shè)備的配置情況,施工高峰負(fù)荷約為:33000KW。按電壓等級(jí)分:
高壓負(fù)荷:纜機(jī)、頂帶機(jī)、塔帶機(jī)、塔機(jī)及混凝土生產(chǎn)系統(tǒng)中的高壓設(shè)備為10KV用電設(shè)備,計(jì)算負(fù)荷約14000KW;電吊等6KV高壓設(shè)備負(fù)荷,計(jì)算負(fù)荷約2000KW。
低壓負(fù)荷:主要由主體工程施工的纜機(jī)副塔、混凝土生產(chǎn)系統(tǒng)、泵站、壓氣站、工區(qū)內(nèi)各輔助工廠(chǎng)以及辦公生活區(qū)等380V/220V低壓設(shè)備組成,計(jì)算負(fù)荷約17000 KW。
6KV高壓變壓器2臺(tái);380V/220V低壓變壓器22臺(tái)。
2.3負(fù)荷分布和布線(xiàn)的選擇
在進(jìn)行布線(xiàn)考慮時(shí),到現(xiàn)場(chǎng)進(jìn)行現(xiàn)場(chǎng)實(shí)地勘測(cè),遇到了一個(gè)比較具體的問(wèn)題:
2.3.1負(fù)荷分布太廣,覆蓋了整個(gè)工地,見(jiàn)圖一。
2.3.2其它標(biāo)段Ⅰ標(biāo)、Ⅱ標(biāo)、Ⅳ標(biāo)等工程正在施工,其10KV施工電線(xiàn)不能拆除,它們已布置在工地全處了,電桿的位置已被占用,同時(shí)龍灘水電站施工區(qū)地形狹窄。如果按常規(guī)布線(xiàn),會(huì)造成了有些檔距極大,大大超出了規(guī)范的極限。
2.3.3大壩標(biāo)有些負(fù)荷較集中,只布置一個(gè)回路,線(xiàn)徑會(huì)選擇很大,對(duì)施工帶來(lái)難度。綜合考慮,以安全、經(jīng)濟(jì)為原則經(jīng)過(guò)多次的實(shí)地勘測(cè)和技術(shù)論證,確定龍灘水電站大壩工程10KV施工供電線(xiàn)路共10個(gè)回路,全采用同桿雙回路設(shè)計(jì)。經(jīng)過(guò)近5年運(yùn)行,仍保持著良好的運(yùn)行狀態(tài),為大壩工程施工提供了強(qiáng)大而可靠的電力,滿(mǎn)足了工程施工用電的需要。
2.4同桿雙回路問(wèn)題的解決
2.4.1同桿雙回技術(shù)問(wèn)題
同桿雙回路存在的兩個(gè)關(guān)鍵問(wèn)題:第一個(gè)問(wèn)題,兩個(gè)回路在同一桿上,受力較大,如果受力不均,易產(chǎn)生倒桿、斷桿問(wèn)題。第二個(gè)問(wèn)題,兩個(gè)回路在同一桿上,線(xiàn)距較近?;〈惯^(guò)小,導(dǎo)線(xiàn)受力過(guò)大降低了安全系數(shù),氣溫再降低時(shí),可能導(dǎo)線(xiàn)過(guò)緊而發(fā)生斷線(xiàn)事故?;〈惯^(guò)大,氣溫上升對(duì)地的距離減小影響安全運(yùn)行;另外風(fēng)力等外力也易產(chǎn)生導(dǎo)線(xiàn)閃絡(luò)造成事故。
2.4.2解決新課題的技術(shù)方案
(1)對(duì)于第一個(gè)問(wèn)題提出兩個(gè)解決的方案,第一把電桿改為線(xiàn)塔,但成本要增加,同時(shí)施工的位置多在山頂,又無(wú)運(yùn)輸?shù)缆泛褪┕る娫?,施工難度大,也要增加并且工期上也要延誤;被領(lǐng)導(dǎo)否肯。第二個(gè)針對(duì)混凝土電桿脆性的特點(diǎn),經(jīng)過(guò)受力分析造成混凝土電桿受力不均,主要是因?yàn)槔€(xiàn)和電桿埋設(shè)不當(dāng)。所以在設(shè)計(jì)中要求對(duì)施工單位提出了:施工中要除了滿(mǎn)足《架空送電線(xiàn)路施工及驗(yàn)收規(guī)范》相關(guān)的要求外:一、坑深需用水準(zhǔn)儀觀(guān)測(cè),提高觀(guān)測(cè)精度;二、當(dāng)坑深超深值在100mm至300mm之間時(shí),必填土夯實(shí)處理;三、坑深超深值超過(guò)300mm以上時(shí),鋪石灌漿處理;四、拉線(xiàn)坑如超深后對(duì)拉線(xiàn)條盤(pán)安裝位置與方向有影響時(shí),也以填土夯實(shí)處理。保證電桿受力符合要求。
2.4.2對(duì)于第二個(gè)問(wèn)題,查閱了相關(guān)資料,解決的辦法主要是弧垂的正確觀(guān)測(cè)。
弧垂的觀(guān)測(cè)法,一般有等長(zhǎng)法、異長(zhǎng)法、角度法和張力緊線(xiàn)法等,現(xiàn)介紹在施工中常用等長(zhǎng)法和異長(zhǎng)法。并且專(zhuān)門(mén)對(duì)施工單位施工專(zhuān)門(mén)進(jìn)行了培訓(xùn)。
2.4.2.1等長(zhǎng)法(即平行四邊形法)。等長(zhǎng)法為施工最常用的觀(guān)測(cè)弧垂的方法,施工班組容易掌握,而且觀(guān)測(cè)精度較高,如圖二所示。
在A、B桿各掛弧垂尺,從架空線(xiàn)懸掛點(diǎn)起始向下量出需測(cè)弧垂f,結(jié)扎一橫觀(guān)測(cè)板,調(diào)整架空線(xiàn)張力至A、B桿的橫尺與導(dǎo)線(xiàn)最低點(diǎn)目測(cè)成一直線(xiàn)時(shí),此架空線(xiàn)的弧垂,即為要求的f值。
在兩桿塔懸掛點(diǎn)高低差不大的情況下,采用等長(zhǎng)法觀(guān)測(cè)弧垂比較精確,若懸點(diǎn)高差較大,宜采用異長(zhǎng)法觀(guān)測(cè)弧垂。
2.4.2.2異長(zhǎng)法,采用異長(zhǎng)法測(cè)弧垂比等長(zhǎng)法多一步手續(xù),圖三的A、B兩桿懸掛的弧垂板數(shù)值,與弧垂f的關(guān)系為:√a+√b=2√f,由此得f=1/2(√a+√b)2 或a=(2√f-√b)
在B桿掛一弧垂板,選擇適當(dāng)?shù)腷值,目的是使視線(xiàn)切點(diǎn)盡量接近架空線(xiàn)弧垂的底部,根據(jù)要求的f值,由上式即可算出A桿弧垂板的a值,再用等長(zhǎng)法相同的測(cè)視方法,調(diào)整導(dǎo)線(xiàn)張力,A、B弧垂板與架空線(xiàn)的最低點(diǎn)底部成一直線(xiàn),此時(shí)的弧垂即為要求的f值。
2.5、無(wú)功補(bǔ)償和事故備用及應(yīng)急電源考慮
2.5.1無(wú)功補(bǔ)償,介于110KV變電所已配有無(wú)功補(bǔ)償,保證功率因素不小于0.9,對(duì)于一般小容量用電設(shè)備沒(méi)有配置補(bǔ)償裝置,但對(duì)于混凝土生產(chǎn)系統(tǒng)等大中型設(shè)備配置了補(bǔ)償裝置,設(shè)有電容柜,以保證供電質(zhì)量。
2.5.2事故應(yīng)急備用電源,配置兩臺(tái)200KVA柴油發(fā)電機(jī)組作為備用電源,布置在大壩基坑附近,前期主要滿(mǎn)足突然事故停電時(shí)基坑開(kāi)挖排水、防洪排水、搶險(xiǎn)照明等用電,后期主要滿(mǎn)足突然事故停電時(shí)大壩澆筑等施工用電。
2.6導(dǎo)線(xiàn)線(xiàn)徑選擇
采用同桿雙回路,解決了供電線(xiàn)路布線(xiàn)問(wèn)題。在考慮線(xiàn)導(dǎo)線(xiàn)徑選擇時(shí),結(jié)合負(fù)荷分布情況,更加完善線(xiàn)路設(shè)計(jì)思路。若設(shè)計(jì)時(shí),考慮在同桿雙回路負(fù)荷集中處設(shè)置一聯(lián)絡(luò)開(kāi)關(guān),其優(yōu)點(diǎn)是:一、若是變電所一個(gè)回路需要檢修或出現(xiàn)了大修事故,我們可以通過(guò)聯(lián)絡(luò)開(kāi)關(guān)快速恢復(fù)雙回路正常供電;二、若一個(gè)回路從變電所至聯(lián)絡(luò)開(kāi)關(guān)這段線(xiàn)路中有了故障,我們可以通過(guò)聯(lián)絡(luò)開(kāi)關(guān)隔離故障,快速恢復(fù)雙回路正常供電。
所以在每回路導(dǎo)線(xiàn)線(xiàn)徑選擇時(shí),以計(jì)算負(fù)荷進(jìn)行選擇,在此基礎(chǔ)上加上同桿的另一回路上計(jì)算負(fù)荷的1/3。目的是在保證本線(xiàn)路的正常運(yùn)行外,可以及時(shí)為故障線(xiàn)路中的設(shè)備送電,以保證生產(chǎn)及時(shí)恢復(fù)正常。在近5年的運(yùn)行中,變電站多次事故停電,但施工用電未受到影響,為大壩順利施工起到了極大的保障作用。這又是同桿雙回路的意外收獲。同時(shí)還有一個(gè)收獲就是如此選擇導(dǎo)線(xiàn)線(xiàn)徑后,電壓降最大的才為4.2%,所以在運(yùn)行后電耗也比較小。
2.6.1右岸纜機(jī)線(xiàn)路
右岸纜機(jī)線(xiàn)路主要是供:右岸纜機(jī)、納福堡預(yù)制廠(chǎng)、上游靠船墩、上游基坑排水及右岸大壩上游側(cè)施工用電。設(shè)備設(shè)計(jì)容量約為5000 KVA,其中右岸2臺(tái)纜機(jī)容量為2×1200 KVA。線(xiàn)路從110KV變電所采用同桿雙回路到右岸纜機(jī)平臺(tái),一回路為纜機(jī)專(zhuān)用,另一回路經(jīng)納福堡到上游圍堰,設(shè)計(jì)每回路額定容量:3600KVA,總?cè)萘繛椋?200KVA;聯(lián)絡(luò)開(kāi)關(guān)安裝在右岸纜機(jī)平臺(tái)。架空線(xiàn)選用LGJ-50,長(zhǎng)度4150米;電纜選用YJV22-3×70,長(zhǎng)度520米。
2.6.2基坑線(xiàn)路
基坑線(xiàn)路主要是供:下游圍堰施工、基坑排水、右岸大壩施工、施工照明、頂帶機(jī)、塔帶機(jī)、供料線(xiàn)、右岸空壓機(jī)、冷水站用電;設(shè)備設(shè)計(jì)容量約為9700 KVA。線(xiàn)路從110KV變電所采用同桿雙回路經(jīng)下游航道一期開(kāi)挖平臺(tái)從4#公路到下游圍堰,一回路以頂帶機(jī)、塔帶機(jī)、供料線(xiàn)為主,一回路經(jīng)圍堰引向基坑供排水和施工用電;設(shè)計(jì)每回路額定容量:6600KVA,總?cè)萘繛椋?3200KVA;聯(lián)絡(luò)開(kāi)關(guān)安裝下游圍堰右岸側(cè)。架空線(xiàn)選LGJ-120,長(zhǎng)度2150米;電纜選用YJV22-3×150,長(zhǎng)度340米。
2.6.3左岸線(xiàn)路
左岸線(xiàn)路主要是供:壩前的左岸混凝土生產(chǎn)系統(tǒng)、雷公灘加工車(chē)間、移動(dòng)塔機(jī)及壩后的門(mén)機(jī)、塔機(jī)、金結(jié)安裝、左岸空壓機(jī)用電;設(shè)備設(shè)計(jì)容量約為7200 KVA。線(xiàn)路從左岸10KV開(kāi)閉所采用同桿雙回路到左岸纜機(jī)平臺(tái),一回路為壩前的左岸混凝土生產(chǎn)系統(tǒng)、雷公灘及移動(dòng)塔機(jī)等用電,另一回路為壩后的門(mén)機(jī)塔機(jī)等用電,設(shè)計(jì)每回路額定容量:5400KVA,總?cè)萘繛椋?0800KVA;聯(lián)絡(luò)開(kāi)關(guān)安裝在左岸纜機(jī)平臺(tái)。架空線(xiàn)選用LGJ-95,長(zhǎng)度4700米;電纜選用YJV22-3×120,長(zhǎng)度350米。
2.6.4混凝土生產(chǎn)系統(tǒng)線(xiàn)路
龍灘大壩工程混凝土用量大,且受施工場(chǎng)地限制,故在右岸308.5及360高程各建立一個(gè)混凝土生產(chǎn)系統(tǒng)。
308.5混凝土生產(chǎn)系統(tǒng)線(xiàn)路:設(shè)備設(shè)計(jì)容量為14100 KVA。線(xiàn)路從110KV變電所采用同桿雙回路到右岸308.5混凝土生產(chǎn)系統(tǒng),設(shè)計(jì)每回路額定容量:8600KVA,總?cè)萘繛椋?7200KVA;聯(lián)絡(luò)開(kāi)關(guān)安裝在308.5混凝土生產(chǎn)系統(tǒng)進(jìn)場(chǎng)口。架空線(xiàn)選用LGJ-185,長(zhǎng)度1250米;電纜選用YJV22-3×240,長(zhǎng)度570米。
360混凝土生產(chǎn)系統(tǒng)線(xiàn)路:設(shè)備設(shè)計(jì)容量為13720 KVA。線(xiàn)路從110KV變電所采用同桿雙回路到右岸360混凝土生產(chǎn)系統(tǒng),設(shè)計(jì)每回路額定容量:8600KVA,總?cè)萘繛椋?7200KVA;聯(lián)絡(luò)開(kāi)關(guān)安裝在360混凝土生產(chǎn)系統(tǒng)進(jìn)場(chǎng)口。架空線(xiàn)選用LGJ-185,長(zhǎng)度1850米;電纜選用YJV22-3×240,長(zhǎng)度520米。
3、結(jié)束語(yǔ)
2003年9月大壩施工10KV供電線(xiàn)路架設(shè)完成,投入運(yùn)行近5年,仍保持良好的運(yùn)行狀態(tài),滿(mǎn)足了大壩工程各階段施工用電要求。
【關(guān)鍵詞】城建施工;混凝土;大體積;施工技術(shù)
一、 背景及前言
混凝土是城建工程的重要原材料之一,在城建工程中起著極其重要的作用。尤其是現(xiàn)在城市建設(shè)發(fā)展快速,高層大體積的特殊功能建筑物通常都采大體積的混凝土。而混凝土的拌料、比例及澆筑施工技術(shù)對(duì)建筑的質(zhì)量密切相關(guān)。大體積混凝土在施工中最易出現(xiàn)的問(wèn)題是結(jié)構(gòu)裂縫,其原因主要是由于溫度的應(yīng)力過(guò)大,導(dǎo)致混凝土的抗拉強(qiáng)度不足以支撐。因此研究大體積混凝土施工技術(shù)關(guān)系著整個(gè)建筑結(jié)構(gòu)的質(zhì)量,關(guān)系到未來(lái)建筑行業(yè)的發(fā)展進(jìn)程也關(guān)系到國(guó)民經(jīng)濟(jì)的快速發(fā)展和人民生命財(cái)產(chǎn)的安全。
二、 大體積混凝土的概念和特性
所謂大體積混凝土是指結(jié)構(gòu)物的最小尺寸大于lm,且水化熱不容易散發(fā)從而引起混凝土內(nèi)外的溫差并導(dǎo)致溫度收縮裂縫的產(chǎn)生及為解決裂縫而采取的施工工藝的混凝土結(jié)構(gòu)。由于混凝土是脆性材料,導(dǎo)致大體積混凝土的以下施工特點(diǎn):高水平的整體性;澆筑的連續(xù)性;結(jié)構(gòu)的體量較大;由于大體積混凝土斷面尺寸大,澆筑之后由于水泥的水化熱而使內(nèi)部溫度劇烈上升,形成較大的內(nèi)外溫差和相當(dāng)大的拉應(yīng)力。
具體的來(lái)說(shuō),在大體積混凝土施工過(guò)程中,由于其具備較厚的結(jié)構(gòu)和較大的形體,鋼筋較密,混凝土量多,施工條件復(fù)雜,技術(shù)要求高,并且須同時(shí)達(dá)到強(qiáng)度、剛度、均一性和持久性性的要求指標(biāo)。此外最主要的任務(wù)就是采取措施控制溫差,將溫度變化導(dǎo)致的拉應(yīng)力限制在一定范圍并控制溫度裂縫的發(fā)生。隨著建筑技術(shù)的發(fā)展和建筑材料性能包括混凝土質(zhì)量等水平的不斷提高,建筑領(lǐng)域逐漸擴(kuò)大,難度也逐漸加大,高質(zhì)量的建筑質(zhì)量和施工技術(shù)也是人民和社會(huì)的必然要求。
三、 大體積混凝土施工技術(shù)
1、編制可實(shí)行方案并設(shè)計(jì)構(gòu)造要求
(1)根據(jù)大體積混凝土工程的施工特點(diǎn),工程設(shè)計(jì)要規(guī)范且滿(mǎn)足生產(chǎn)工藝的要求,重點(diǎn)編制混凝土的材料供應(yīng)計(jì)劃、混凝土的澆筑方案、大體積混凝土的溫度測(cè)量及控制、混凝土的維護(hù)等方面的方案。
(2)具體的來(lái)說(shuō),為了控制裂縫,施工前應(yīng)計(jì)算并驗(yàn)證大體積混凝土澆筑結(jié)構(gòu)的溫度、溫度變化及相應(yīng)應(yīng)力,估測(cè)出大體積混凝土澆筑結(jié)構(gòu)在施工過(guò)程中的升溫幅度、內(nèi)外溫差及降溫速度的控制指標(biāo),制訂專(zhuān)項(xiàng)的溫控建筑的技術(shù)措施。如此以來(lái),根據(jù)設(shè)計(jì)構(gòu)造的要求即溫控指標(biāo),包括溫升幅度、內(nèi)外溫差和降溫速度,來(lái)制定溫控施工的技術(shù)措施,如選取合適的混凝土原材料并設(shè)計(jì)溫度監(jiān)控、降溫、保溫維護(hù)等措施,從而有效的防止拉應(yīng)力引起的過(guò)程裂縫。
2、改善內(nèi)外約束,加快散熱速度
與設(shè)計(jì)單位商討并征得其同意,選取分層或(和)分塊間歇澆筑的方式減小塊體尺寸來(lái)加快散熱,降低溫升的幅度。
(1)分層間歇性的澆筑
①分層間歇澆筑,時(shí)間間隔要設(shè)置合理,要兼顧利于散熱和防止溫度突降,還要注意下層對(duì)上層的約束。下層混凝士的表面溫度與新澆混凝土的澆筑溫度之差一般控制在10攝氏度以?xún)?nèi),間隔以7-10d為最佳,0.6-1.8m的分層合度較為合適。②在下層混凝土表面合適的位置,一般間隔0.8-1.2m設(shè)置鍵槽,可以有效地加強(qiáng)層間的結(jié)合。鍵槽的形狀和構(gòu)造可以是采用邊長(zhǎng)為0.1m的木方形狀也可以插入鋼筋,并且伸入混凝土中(包括上、下層)約400-500mm③為了保證澆筑層附近溫度筋的作用,可將溫度鋼筋根據(jù)需要做合理的調(diào)整和設(shè)置。一般采用細(xì)和密的溫度鋼筋并采用雙向鋼筋15cm的間距布局。這樣的設(shè)置可以有效的改善混凝土表面的抗拉能力。
(2)分塊間歇性的澆筑
①當(dāng)采取的分塊比較多時(shí),“跳倉(cāng)法”是一個(gè)比較合理的施工方式,分塊尺寸應(yīng)限制在30m以?xún)?nèi);分塊澆筑的時(shí)間最好超過(guò)7d,為達(dá)到更好的效果可以進(jìn)一步適當(dāng)延長(zhǎng)時(shí)間。②分塊之間的連接可以留有臺(tái)階式的施工縫,其高寬比最好不超過(guò)10,增設(shè)粗鋼筋或鋼軌在施工縫的垂直面上,在水平面上進(jìn)行鑿毛,設(shè)置鍵槽等等方式來(lái)增強(qiáng)結(jié)臺(tái)。
3、配合比例及材料選擇
(1)配合比設(shè)計(jì)
混凝土的配合比需要嚴(yán)格控制,過(guò)多的水泥用量會(huì)加快混凝土的水化熱,而過(guò)少則會(huì)降低混凝土的強(qiáng)度。只有選擇合適的水泥量才會(huì)獲得性能良好的混凝土。選用水化熱處于中低程度的水泥來(lái)配置混凝土,其中例如礦渣、火山灰質(zhì)等硅酸鹽水泥、復(fù)合水泥以及粉煤灰水泥等,可以有效地混凝土中水和水泥的需求量。粉煤灰的一定量摻入可以改善混凝土可泵性,降低混凝土水熱化程度。
(2)材料選擇
作為混凝土的主要原材料,水泥的選擇需要是符合國(guó)家標(biāo)準(zhǔn)規(guī)定的復(fù)合水泥、普通硅酸鹽水泥等。除此之外,水泥的質(zhì)量必須也必須得到保證,必須經(jīng)過(guò)嚴(yán)格的質(zhì)量檢測(cè),杜絕不符合要求的水泥用到城建工程上。粗骨料最好使用連續(xù)級(jí)配,而細(xì)骨料適宜采用中砂或中粗砂。級(jí)配較好的粗骨料可以降低孔隙率和水化熱,而細(xì)骨料水熱化更低因?yàn)槠渚邆湫〉目紫堵?。從而可以有效防止建筑裂縫的產(chǎn)生。而在混凝土的版之中,水也起著非常關(guān)鍵的作用,需要根據(jù)國(guó)家相關(guān)標(biāo)準(zhǔn)選取混凝土用水。
四、 混凝土的澆筑和養(yǎng)護(hù)
(1) 混凝土的澆筑
混凝土的澆筑也是城建工程中最重要的一步,一般采用“斜面分層、薄層澆筑,循序退打,一次到底”的連續(xù)施工方法。多個(gè)施工泵同時(shí)工作,每個(gè)只負(fù)責(zé)一定寬度范圍之內(nèi)的澆筑帶,從而可以簡(jiǎn)化混凝土的泌水處理。有效的防止施工裂縫的出現(xiàn)。
首先需要確保新的混凝土可以將原油混凝土在初凝之前進(jìn)行覆蓋,按照固定的時(shí)間間距來(lái)進(jìn)行相應(yīng)的搗振工作。泌水的處理需要做好事先準(zhǔn)備,由于在混凝土澆筑過(guò)程中,漿水和泌水不斷上涌并順著混凝土的坡度流到坑底,因此在施工地基打造時(shí),應(yīng)設(shè)置坡度引導(dǎo)泌水外流到排水坑和基坑之外?;炷翝仓?,初凝之前,需要進(jìn)行拍打真是,并用木尺磨平,趕走表面的泌水。之后再終凝之前,用木楔平實(shí),閉合水裂縫。
(2) 混凝土的養(yǎng)護(hù)
為了防止底板混凝土溫度的升降速度快導(dǎo)致收縮裂縫和早期脫水造成平面干縫。初凝之后,應(yīng)當(dāng)采用覆蓋塑料薄膜的方法,終凝之后需要進(jìn)行澆水養(yǎng)護(hù),保證混凝土表面的濕潤(rùn)。覆蓋養(yǎng)護(hù)方法包含基礎(chǔ)底板、混凝土表面覆蓋2層塑料薄膜,2層麻袋加在薄膜上。養(yǎng)護(hù)時(shí)間一般從澆筑成型開(kāi)始大于14d。等到混凝土內(nèi)部的溫度逐漸降低并趨于平穩(wěn)時(shí)解除養(yǎng)護(hù)。但在養(yǎng)護(hù)過(guò)程中,為了減緩混凝土降溫速度和收縮速度,應(yīng)該逐漸減少覆蓋層的厚度。
為了更好的實(shí)現(xiàn)低碳建筑在人們意識(shí)中的確立,政府要引導(dǎo)和激勵(lì)參與建設(shè)的各方力量投入到建設(shè)當(dāng)中來(lái)。這就有必要采取有利于推進(jìn)低碳建筑發(fā)展的行為機(jī)制。低碳建筑激勵(lì)機(jī)制指的是以生態(tài)城市理念為基礎(chǔ),引導(dǎo)并促使建筑中的主客體各方積極主動(dòng)地投入到低碳建筑的發(fā)展中,不斷努力采取有效措施,從而把低碳建筑可持續(xù)發(fā)展的機(jī)制有效落實(shí)。下文從宣傳推廣教育、政府財(cái)政補(bǔ)貼以及稅收優(yōu)惠政策的落實(shí)三個(gè)方面給出激勵(lì)機(jī)制的具體落實(shí)的一些討論。
五、 總結(jié)
城建工程大體積的混凝土的施工問(wèn)題和相關(guān)技術(shù)在本文得到了全面的討論。針對(duì)大體積混凝土施工中由于溫差導(dǎo)致的拉伸應(yīng)力從而產(chǎn)生溫度裂縫的問(wèn)題,從混凝土選用材料、配合比設(shè)計(jì)以及混凝土澆筑和養(yǎng)護(hù)方面給出了相關(guān)建議?;炷恋馁|(zhì)量直接關(guān)系著城建工程建筑的質(zhì)量和壽命,關(guān)系著人民財(cái)產(chǎn)安全的重大事宜。因此在建筑過(guò)程中應(yīng)該做好前期設(shè)計(jì)規(guī)劃準(zhǔn)備,嚴(yán)格混凝土材料質(zhì)量的檢測(cè),采取一定的維護(hù)措施保證大體積混凝土施工的順利完成。
參考文獻(xiàn):
[關(guān)鍵詞]市政工程;高大模板;模板安裝
高大模板施工技術(shù)在市政道路工程施工中的應(yīng)用能有效地解決工程施工的重難點(diǎn)問(wèn)題,提升工程施工質(zhì)量,減少安全事故發(fā)生的可能,保證市政工程項(xiàng)目建設(shè)得到預(yù)期的經(jīng)濟(jì)和社會(huì)效益。
1工程概況
某市政地道及兩側(cè)道路工程施工第3標(biāo)段,其起點(diǎn)樁號(hào)為K4+127.0,終點(diǎn)樁號(hào)為K4+737.324,全長(zhǎng)610.324m。本工程結(jié)構(gòu)形式包括以下3種:暗埋段、鏤空段及標(biāo)準(zhǔn)敞開(kāi)段,其中暗埋段由A暗埋段及B暗埋段2部分組成,見(jiàn)表1。本工程中,A暗埋段及鏤空段跨度大于18m,且各段施工總荷載均大于15kN/m2,按照超過(guò)一定規(guī)模的危險(xiǎn)性較大的分部分項(xiàng)工程的有關(guān)要求,該工程應(yīng)編制高大模板專(zhuān)項(xiàng)施工方案,并通過(guò)專(zhuān)家論證。
2高大模板施工技術(shù)研究
本工程涉及的高支模施工部位包括暗埋段、標(biāo)準(zhǔn)敞開(kāi)段、鏤空段等部位的板及梁結(jié)構(gòu),高支模施工時(shí),在流水段劃分的基礎(chǔ)上根據(jù)沉降縫間距(31~41m)確定架體搭設(shè)長(zhǎng)度,搭設(shè)完成一段后,澆筑一段。模板選用規(guī)格為16mm厚的膠合板,次龍骨選用規(guī)格為80mm×100mm的方木,主龍骨選用10號(hào)工字鋼。模板支撐架采用A60A型盤(pán)扣式滿(mǎn)堂腳手架,立桿規(guī)格A60mm×3.2mm,橫桿規(guī)格A48mm×2.5mm。外墻腳手架采用扣件式鋼管腳手架,鋼管規(guī)格A48.3mm×3.6mm,對(duì)拉螺栓均采用3段式止水螺桿,見(jiàn)表2。
2.1頂板模板安裝
2.1.1頂板模板支設(shè)流程頂板模板支設(shè)應(yīng)按照以下流程進(jìn)行:首先設(shè)置“滿(mǎn)堂”支撐架,其次是主龍骨、次龍骨和柱頭模板龍骨的安裝,緊接著是頂板模板的拼裝,拼裝完成后要對(duì)模板進(jìn)行調(diào)整并予以驗(yàn)收,然后才能進(jìn)行下一道工序的施工。2.1.2模板安裝(1)根據(jù)底板面彈出定位線(xiàn)。(2)需根據(jù)設(shè)計(jì)的標(biāo)高,對(duì)支架標(biāo)高予以調(diào)整,進(jìn)行梁底模板的安裝,然后拉線(xiàn)找平。本工程跨度超過(guò)4m的頂板均按1/1000的標(biāo)準(zhǔn)起拱。(3)梁、板下面的基礎(chǔ)要牢固,確保梁支撐在牢固基礎(chǔ)面上。對(duì)于梁部架體,要按照縱、橫雙向剪刀撐的方式進(jìn)行設(shè)置,同時(shí)要保證剪刀撐底部的強(qiáng)度,需盯緊混凝土接觸面。2.1.3頂板模板安裝質(zhì)量要求頂板模板安裝要有明確的質(zhì)量要求。(1)安裝后模板表面無(wú)雜物、平整度良好及拼縫嚴(yán)密,避免漏漿。(2)安裝后模板承載力、剛度和穩(wěn)定性等符合規(guī)定要求,能滿(mǎn)足混凝土澆筑施工時(shí)存在的混凝土自重、對(duì)模板的側(cè)壓力和施工過(guò)程中的其他荷載等。(3)根據(jù)設(shè)計(jì)要求,保證模板安裝后產(chǎn)生的偏差處于允許的控制范圍內(nèi)。(4)需在模板支撐系統(tǒng)的頂部、底部均設(shè)置可調(diào)支撐頭以及可調(diào)底座,從而調(diào)整模板的水平以及標(biāo)高。
2.2梁模板安裝
(1)梁模板安裝的施工工藝:進(jìn)行抄平及軸線(xiàn)和水平線(xiàn)的彈線(xiàn)→搭設(shè)模板支撐架→支柱頭模板→鋪設(shè)梁底部模板→拉線(xiàn)找平(起拱)→鋼筋綁扎施工→側(cè)模封設(shè)。(2)模板鋪設(shè):根據(jù)設(shè)計(jì)的標(biāo)高,對(duì)于立柱的標(biāo)高進(jìn)行拉線(xiàn)調(diào)整,然后進(jìn)行梁底部模板的安裝。當(dāng)梁的跨度不小于4m時(shí),按1/1000的標(biāo)準(zhǔn)起拱。當(dāng)出現(xiàn)主梁、次梁交接處時(shí),應(yīng)按照先主梁后次梁起拱的方式進(jìn)行。
2.3墻模板安裝
墻模板安裝工藝流程,如圖1所示。2.3.1施工準(zhǔn)備墻模施工前,首先需按照施工圖紙放線(xiàn),其次進(jìn)行鋼筋綁扎和隱檢,接下來(lái)仔細(xì)清掃待澆筑混凝土部位,保持干凈無(wú)雜物;然后設(shè)置墻模定位塑料套管,安裝預(yù)埋線(xiàn)管及線(xiàn)盒;對(duì)于腳手架的搭設(shè)、安裝墻模配件,應(yīng)按規(guī)定要求將脫模劑涂抹均勻。2.3.2墻模安裝為避免模板對(duì)拉螺栓與主筋相碰撞而影響施工質(zhì)量,采取以下措施。(1)在墻體模板安裝施工前,需在頂板上彈出穿墻螺栓的位置線(xiàn)。在具體施工時(shí),發(fā)生了鋼筋位置偏移或穿墻螺栓難以對(duì)穿等現(xiàn)象時(shí),要立即采取措施進(jìn)行鋼筋調(diào)整。(2)立好墻模的陰角和陽(yáng)角等部位并臨時(shí)固定好;然后將已安裝完畢的墻體一側(cè)模板吊裝至定位線(xiàn)處。(3)待模板已準(zhǔn)確吊至預(yù)定位置后,設(shè)置穿墻桿、夾上模板夾具,并使用工具進(jìn)行緊固夾緊。(4)待穿墻桿安裝好后,重復(fù)以上操作工序,使墻面另一側(cè)模板也完成安裝,在保證墻模支撐好墻體墻板時(shí),錨固穿墻桿銷(xiāo)子。(5)調(diào)整模板的垂直度,打好斜撐,夾緊模板夾具。2.3.3模板施工注意事項(xiàng)(1)在澆筑混凝土前,需對(duì)模板施工進(jìn)行認(rèn)真核驗(yàn),檢查模板位置,仔細(xì)檢查墻體模板的標(biāo)高以及垂直度,查驗(yàn)預(yù)留孔洞數(shù)量、位置以及尺寸,檢查模板支撐體系的穩(wěn)固性以及接縫的嚴(yán)密性。(2)處理和控制好模板接頭部位,此處是模板施工的難點(diǎn)。如未處理好,將會(huì)導(dǎo)致混凝土施工后的外觀(guān)質(zhì)量較差,須提高制作水平并拼接牢靠,提高此處的施工質(zhì)量。(3)模板材料,特別是對(duì)于周轉(zhuǎn)性模板,在安裝前須要清理干凈,然后按規(guī)定要求涂抹隔離劑,嚴(yán)禁使用破損、平整度差的模板。(4)澆筑混凝土?xí)r,需安排木工進(jìn)行模板保護(hù)和修正,一旦模板出現(xiàn)問(wèn)題,要第一時(shí)間進(jìn)行處理,保證施工質(zhì)量。(5)澆筑過(guò)程中,機(jī)電預(yù)埋應(yīng)派專(zhuān)人看管,防止?jié)仓^(guò)程中造成預(yù)埋管偏移嚴(yán)重。
2.4混凝土澆筑
2.4.1混凝土布料方式采用汽車(chē)泵澆筑(備用地泵及布料機(jī)),底板和頂板澆筑順序?yàn)闈仓^(qū)域南、北兩側(cè)對(duì)稱(chēng)澆筑。混凝土澆筑采用“推移式連續(xù)施工”澆筑方案,每層約500mm,振搗施工時(shí),要垂直于混凝土澆筑過(guò)程混凝土受自重作用自然流淌產(chǎn)生的斜面,混凝土自然流淌的距離大多是20m,因此,要將其坡度控制在1∶5左右,斜面錯(cuò)層的水平距離應(yīng)大于4m。在混凝土澆筑時(shí),其靠自重自然流淌形成坡度,振搗要均勻全面,可使混凝土極限抗拉強(qiáng)度得到有效提高,也能有效避免由于混凝土沉落而導(dǎo)致裂縫的產(chǎn)生,具體如圖2、圖3所示。側(cè)墻澆筑時(shí),分層進(jìn)行澆筑,每步澆筑厚度控制在50cm內(nèi)。澆筑施工中,要嚴(yán)格控制澆筑的間歇時(shí)間,保證上部混凝土澆筑要在下部混凝土初凝前完成,同時(shí)振搗上部混凝土?xí)r,為提高上、下層混凝土的結(jié)合性,應(yīng)使振搗棒下插5cm。2.4.2布料混凝土澆筑施工時(shí),嚴(yán)禁其從泵管出來(lái)后在某一位置連續(xù)、集中布料,應(yīng)移動(dòng)布料,布料點(diǎn)控制在不大于2m的范圍內(nèi),從而避免混凝土集中堆積。2.4.3振搗(1)為保證混凝振搗的均勻性和密實(shí)性,振搗施工人員宜略微上下抽動(dòng)振動(dòng)棒,一般將振搗時(shí)間控制在20~30s,直到觀(guān)察到混凝土表面無(wú)氣泡并逐漸有灰漿泛出,完成振搗。(2)振搗作業(yè)時(shí),要按照逐點(diǎn)按序的方式進(jìn)行,確保振搗均勻,直到混凝土表面出現(xiàn)浮漿并不再沉落,在振搗時(shí),要盡可能地減少振動(dòng)棒與鋼筋間的碰撞,避免造成鋼筋的變形、移位;振搗棒插點(diǎn)采用行列式的次序移動(dòng),單次的移動(dòng)距離不超過(guò)振搗棒有效作用半徑(30~40cm)的1.25倍。(3)振搗按照“快插慢拔”的方式進(jìn)行,為保證混凝土振搗密實(shí),應(yīng)“先振低處,后振高處”,避免在高低坡面處振搗時(shí)發(fā)生混凝土“松頂”的情況,如圖4所示。(4)混凝土的二次振搗應(yīng)在混凝土初凝前約1h(混凝土的坍落度為30~50mm時(shí))進(jìn)行,使振搗棒正常運(yùn)行,依其自重插入混凝土中振搗,慢慢拔出振動(dòng)棒后,振搗處的混凝土應(yīng)能自動(dòng)閉合,且不會(huì)留下孔洞。2.4.4混凝土表面處理施工時(shí),大體積混凝土要有特殊的處理方式,因其表面會(huì)產(chǎn)生很厚的1層水泥漿泌水極其嚴(yán)重,要進(jìn)行重點(diǎn)處理。根據(jù)標(biāo)高的基準(zhǔn),使用鋁合金管尺進(jìn)行刮平處理,在混凝土終凝前,還需采用打磨機(jī)打磨平整,以達(dá)到閉合混凝土收水裂縫的效果,并且為后期的防水施工提供便利。針對(duì)混凝土表面的泌水情況,可在混凝土澆筑快要結(jié)束時(shí),人為設(shè)法將水引至低洼的邊緣部位,待形成小水潭時(shí)再使用水泵將其抽走,排至排水溝。此外,混凝土澆筑后的4~8h,應(yīng)將部分浮漿予以清除,先使用長(zhǎng)刮尺刮平,再用木抹子搓平壓實(shí)。對(duì)于混凝土初凝后表面出現(xiàn)的龜裂現(xiàn)象,可在混凝土終凝前二次抹壓,從而消除龜裂紋,如圖5所示。
3施工中的重難點(diǎn)及措施
(1)作業(yè)安全防護(hù)方面。高支模施工安全防護(hù)是重點(diǎn),近期全國(guó)安全事故頻發(fā),安全生產(chǎn)是重中之重,因此需點(diǎn)做好以下4個(gè)方面。1)加強(qiáng)安全旁站監(jiān)督,高支模區(qū)域設(shè)置專(zhuān)職安全員進(jìn)行旁站監(jiān)督;2)重點(diǎn)檢查工人安全防護(hù)措施佩戴及使用情況;3)成立安全檢查小組,對(duì)高支模區(qū)域加強(qiáng)巡查與教育;4)現(xiàn)場(chǎng)提供足夠照明,夜間加班監(jiān)督旁站。(2)拆模時(shí)間控制方面。本工程施工面積較大,施工順序?yàn)槎帱c(diǎn)同步施工,模板的拆模時(shí)間是本工程中的一個(gè)重難點(diǎn)。在施工過(guò)程中,要做好混凝土的澆筑時(shí)間記錄表,混凝土試塊的報(bào)告要及時(shí)收取并上報(bào)項(xiàng)目總工。(3)鋼管扭曲、變形、開(kāi)裂,花盤(pán)脫落方面。主要是未嚴(yán)格把控進(jìn)場(chǎng)材料、搭設(shè)過(guò)程中現(xiàn)場(chǎng)管控不嚴(yán)等原因造成的,因此,在材料進(jìn)場(chǎng)時(shí),要加強(qiáng)鋼管的外觀(guān)檢查;在施工過(guò)程中,要加強(qiáng)現(xiàn)場(chǎng)工人的安全技術(shù)交底,及時(shí)清退不合格的材料,避免不合格材料用于架體搭設(shè)。(4)高支模過(guò)程監(jiān)測(cè)方面。要加強(qiáng)搭設(shè)過(guò)程、使用過(guò)程的監(jiān)測(cè),搭設(shè)高支模及澆筑混凝土過(guò)程中,在容易變形的位置設(shè)置監(jiān)測(cè)點(diǎn),需專(zhuān)職的測(cè)量人員在現(xiàn)場(chǎng)進(jìn)行實(shí)時(shí)監(jiān)測(cè),確保能?chē)?yán)格地按照規(guī)定的方法和順序進(jìn)行施工,保證支撐體系的施工安全。
4結(jié)束語(yǔ)
基于某市政道路工程建設(shè)項(xiàng)目,首先簡(jiǎn)單闡述了工程的基本概況,然后對(duì)高支模施工技術(shù)應(yīng)用展開(kāi)研究,主要介紹架體的搭設(shè)、頂板模板安裝、梁模板安裝、墻模板安裝以及混凝土澆筑施工等內(nèi)容,最后分析該工程施工中的重難點(diǎn)和相應(yīng)的應(yīng)對(duì)措施,希望能為類(lèi)似工程的施工提供一定幫助和借鑒。
參考文獻(xiàn)
[1]劉峰.高大模板建筑工程施工技術(shù)與質(zhì)量控制要點(diǎn)[J].建筑技術(shù)開(kāi)發(fā),2021,48(10):37–38.
[2]高玉峰.建筑工程中高大模板支設(shè)的施工工藝和施工技術(shù)分析[J].工程建設(shè)與設(shè)計(jì),2021(1):179–180,193.
[3]王鋒濤.市政工程安全生產(chǎn)特點(diǎn)及安全防范對(duì)策[J].科技創(chuàng)新與應(yīng)用,2021,11(15):138–140.
關(guān)鍵詞:水利工程建設(shè);大壩基礎(chǔ);可液化土層處理
中圖分類(lèi)號(hào):TV551.4文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):2095-980X(2015)11-0136-02
作者簡(jiǎn)介:申亞蘭(1986-),女,湖南湘潭人,碩士,助理工程師,主要研究方向:水利工程,水文水資源工程,水文預(yù)報(bào)及防洪影響評(píng)價(jià)等
1水利水電工程大壩地基分析
水利工程的大壩建設(shè)時(shí)所處的地質(zhì)環(huán)境往往比較復(fù)雜,如果遇到不良地基并且處置不當(dāng),就會(huì)對(duì)大壩本身的質(zhì)量造成十分嚴(yán)重的影響,其主要表現(xiàn)有以下幾個(gè)方面:①由于惡劣的地基條件造成的抗滑結(jié)構(gòu)面的強(qiáng)度低,承受壓力的指標(biāo)低于設(shè)計(jì)要求,致使無(wú)法滿(mǎn)足建筑物的抗滑性和穩(wěn)定性的要求。②由于土層較軟或強(qiáng)度分布不均,無(wú)法承受上部建筑物的壓力而產(chǎn)生嚴(yán)重的不均勻沉降,從而嚴(yán)重影響工程質(zhì)量。③大壩地基屬于礫石層、構(gòu)造碎帶等透水性比較好的地質(zhì)構(gòu)造,一旦處置不當(dāng)就會(huì)產(chǎn)生比較嚴(yán)重的透水、滲透,從而引發(fā)質(zhì)量問(wèn)題。
2壩基巖層的選擇與基礎(chǔ)處理工藝
(1)壩基巖層的選擇。由于水利工程大多位于山區(qū),因此大壩大多建筑在巖體上,地基巖體不可避免地要受到各種風(fēng)化影響,當(dāng)巖性相近、巖層的形成時(shí)間大致相同時(shí),巖體風(fēng)化程度和不同風(fēng)化帶的厚度就具有一定的對(duì)應(yīng)性。此外,巖體中經(jīng)常會(huì)存在大的斷層或結(jié)構(gòu)面,這些構(gòu)造不僅會(huì)對(duì)大壩的穩(wěn)定性造成較大影響,同時(shí)還是潛在地震的發(fā)震帶,對(duì)于這些問(wèn)題,在壩基選址前,必須評(píng)價(jià)其對(duì)建壩的影響。
(2)壩基巖層斷層的處理。①重力壩的斷層。重力壩的斷層通常挖至適當(dāng)?shù)纳疃然靥罨炷寥姆椒▉?lái)處理?;靥罨炷梁筮€要在周邊的基巖中進(jìn)行灌漿處理。②大壩上下游方向的斷層。當(dāng)各壩段的壩基抗剪摩擦安全系數(shù)不足時(shí)需要設(shè)置混凝土塞來(lái)彌補(bǔ)抗滑力的不足。當(dāng)壩基底面雖有斷層但是基巖具有足夠的抗剪強(qiáng)度時(shí),可不必設(shè)置混凝土塞。所以通常大壩上下游方向有斷層時(shí),應(yīng)該按穩(wěn)定計(jì)算不需要混凝土塞。③平行壩軸線(xiàn)方向的斷層。對(duì)于橫穿河流的斷層的能夠用混凝土塞加固,其深度需要綜合壩高、軟弱巖層的位置、壩體混凝土或基巖和軟弱巖層間的變形程度的比值等條件綜合分析確定。此外使軟弱巖層的規(guī)模較小,也要求混凝土塞有相當(dāng)大的深度,尤其是當(dāng)軟弱巖層與壩軸線(xiàn)斜交時(shí),要加大各壩段的底面面積,以保證所規(guī)定的抗剪摩擦安全系數(shù)。
3一些特殊地基的處理新工藝
(1)強(qiáng)透水層的防滲處理。一是對(duì)于強(qiáng)透水層的礫石、卵石和砂進(jìn)行開(kāi)挖清除,然后利用混凝土及粘土進(jìn)行填充,建造截水墻。二是采用沖擊鉆造出大口徑的孔,填充粘土或混凝土建成防滲墻。三是使用高壓噴射灌漿的手段建造水泥防滲墻。
(2)可液化土層處理。對(duì)于可液化土層的常用處理方法有:①分層振動(dòng)壓實(shí)。②在可液化土層設(shè)立砂井、灰土樁或者砂樁。③開(kāi)挖清除后充填強(qiáng)度更高的材料。④在可液化土層周?chē)没炷练忾]。
(3)軟弱夾層基礎(chǔ)的處理。軟土基礎(chǔ)的特點(diǎn)是含水量高但是透水性差,這種基礎(chǔ)土層一般情況下純含水量能夠達(dá)到50%到70%,因此低抗剪強(qiáng)度較低。
(4)深覆蓋層的處理。深覆蓋層的常用處理方法有:①擴(kuò)大基礎(chǔ);②設(shè)置混泥土截水墻;③強(qiáng)夯法;④摩擦樁或沉重樁;⑤壩前鋪蓋防滲。
(5)壩基涌泉的處理。壩基涌泉會(huì)使得土壩由于管涌流土降低壩身穩(wěn)定性。同時(shí)給混凝土澆筑帶來(lái)麻煩,處理時(shí)一般采用能排則排、能堵則堵的處理原則。
4結(jié)語(yǔ)
1、尤其是在正規(guī)的場(chǎng)合,穿著打扮的問(wèn)題越來(lái)越引起我們現(xiàn)代人的重視。男士在著裝上穿出與眾不同、典雅時(shí)尚的風(fēng)姿,先從服裝色彩上了解服裝搭配技巧。
2、一般來(lái)說(shuō),如果同一個(gè)色與白色搭配時(shí),會(huì)顯得明亮;與黑色搭配時(shí)就顯得昏暗。因此在進(jìn)行服飾色彩搭配時(shí)應(yīng)先衡量一下,你是為了突出哪個(gè)部分的衣飾。
3、補(bǔ)色配合:指兩個(gè)相對(duì)的顏色的配合,如:紅與綠,青與橙,黑與白等,補(bǔ)色相配能形成鮮明的對(duì)比,有時(shí)會(huì)收到較好的效果.黑白搭配是永遠(yuǎn)的經(jīng)典。
4、同類(lèi)色搭配原則 指深淺、明暗不同的兩種同一類(lèi)顏色相配,比如:青配天藍(lán),墨綠配淺綠,咖啡配米色,深紅配淺紅等,同類(lèi)色配合的服裝顯得柔和文雅。
(來(lái)源:文章屋網(wǎng) )
[關(guān)鍵詞]級(jí)配碎石;基層;公路大修;施工工藝;施工技術(shù)
中圖分類(lèi)號(hào):U416.214 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1009-914X(2014)20-0183-01
引言
2013年9月交通運(yùn)輸部的《中國(guó)公路水路交通運(yùn)輸發(fā)展報(bào)告》顯示,我國(guó)公路總里程達(dá)424萬(wàn)公里,居世界第一。如此龐大的公路運(yùn)輸體系給公路大修工程帶來(lái)了嚴(yán)峻挑戰(zhàn),隨著交通運(yùn)輸業(yè)日益激烈的競(jìng)爭(zhēng),為追求經(jīng)濟(jì)利益運(yùn)輸單位重載、超載對(duì)交通路面造成的裂縫、路面網(wǎng)裂等嚴(yán)重破壞現(xiàn)象日益突出。為提高道路建設(shè)質(zhì)量保證駕駛?cè)藛T的行車(chē)環(huán)境,從而對(duì)路面基層的施工質(zhì)量提出了更高的技術(shù)要求。
1 施工技術(shù)
1.1 集料選擇
級(jí)配碎石基層集料的選擇包括兩種粗集料和細(xì)集料。對(duì)于粗集料的選擇考慮其整體使用性一般選用強(qiáng)度高、韌性好的巖石,粗集料壓碎值和針片狀顆粒含量對(duì)級(jí)配碎石混合料的合成級(jí)配均有顯著影響,且二者之間存在疊加效益。
綜合試驗(yàn)結(jié)果,對(duì)用于級(jí)配碎石的粗集料,選擇針片狀顆粒含量不宜超過(guò) 10%,壓碎值不宜超過(guò) 26%[1]。對(duì)于細(xì)集料則考慮使用天然砂,因其具有較好的和易性和保水性,且易于快速成型,不容易分離,但要求工作人員對(duì)含泥量嚴(yán)格控制。為防止竄料,集料應(yīng)與其他石料分開(kāi)堆放。
1.2 級(jí)配碎石拌和
比例控制 級(jí)配碎石控制比例要求根據(jù)施工標(biāo)準(zhǔn)嚴(yán)格控制,一般級(jí)配碎石通過(guò)碾壓低粘結(jié)力的松散材料來(lái)達(dá)到所需的結(jié)構(gòu)性能,采用嵌擠密實(shí)型結(jié)構(gòu),該結(jié)構(gòu)能夠決定級(jí)配碎石的使用性能大小。依據(jù)公路施工標(biāo)準(zhǔn)情況,級(jí)配碎石的最佳級(jí)配比在 16~31.5mm 占 25%,5~16mm 占 40%,河砂占 35%,對(duì)細(xì)集料用量嚴(yán)格控制[2]。
水量控制 作為水穩(wěn)施工的一個(gè)重要監(jiān)測(cè)指標(biāo),需要針對(duì)實(shí)際的工程環(huán)境通過(guò)天氣、集料含水量、運(yùn)距等情況對(duì)含水量進(jìn)行動(dòng)態(tài)控制,同時(shí)施工前后場(chǎng)需要保持隨時(shí)聯(lián)系,及時(shí)對(duì)含水量進(jìn)行控制,一般含水量控制在最佳含水量的0%-1%。另外,含水量還需根據(jù)具體下承層的類(lèi)型來(lái)做適當(dāng)調(diào)整,一般的,對(duì)于土基和穩(wěn)定細(xì)粒土類(lèi)的下承層,可以根據(jù)具體情況適當(dāng)減少含水量的調(diào)整。
拌和均勻控制 對(duì)于拌和均勻以出料不發(fā)生離析為準(zhǔn),控制拌和時(shí)間,一般的時(shí)間越長(zhǎng)拌和效果越好。另外,針對(duì)實(shí)際的操作情況,集中廠(chǎng)拌的拌和均勻性較好,能夠顯著提升級(jí)配碎石的生產(chǎn)效率,工程項(xiàng)目質(zhì)量也更加符合要求。
1.3 級(jí)配碎石運(yùn)輸
級(jí)配碎石運(yùn)輸環(huán)節(jié)的裝卸過(guò)程,容易發(fā)生集料離析。為避免離析現(xiàn)象發(fā)生,裝料時(shí),在從拌和機(jī)向運(yùn)料車(chē)裝料時(shí),需每裝一斗混合料將運(yùn)料車(chē)向前移動(dòng)一斗混合料所占的距離,以使粗料落在車(chē)廂中部。便于在卸料是粗細(xì)集料能夠再次混合,從而避免集料離析現(xiàn)象的發(fā)生;卸料時(shí),要求卸料車(chē)邊卸料邊向前移動(dòng),避免因集料堆積過(guò)高發(fā)生集料離析,同時(shí)堆積集料需避免平行堆放,應(yīng)以品字形布置避免發(fā)生離析。
1.4 級(jí)配碎石攤鋪
級(jí)配碎石的攤鋪包括三種方式:(1)推土機(jī)和平地機(jī)協(xié)同作業(yè)攤鋪方式;(2)裝載機(jī)和人工整平方式;(3)攤鋪機(jī)單獨(dú)作業(yè)的方式。對(duì)該國(guó)道路段的大修采用第二種方式,裝載機(jī)配合人工整平的方式。攤鋪時(shí)的技術(shù)要求:①級(jí)配碎石含水量有所增加,約高出最佳含水量的2%-3% ②松鋪系數(shù)應(yīng)嚴(yán)格設(shè)置在1.15~1.25 之間[3]③安排相關(guān)人員在對(duì)粗離析和細(xì)離析的地帶和路段進(jìn)行處理,一般采用粗細(xì)集料灑水、拌和、整平方式,消除離析或挖除換料 ④整平階段結(jié)束后應(yīng)及時(shí)碾壓,對(duì)相關(guān)結(jié)構(gòu)合理的進(jìn)行調(diào)整,保障后續(xù)工作繼續(xù)進(jìn)行?;旌狭蠑備仌r(shí)必須要緩慢、均勻、不間斷的攤鋪,攤鋪進(jìn)行時(shí)不得隨意變換攤鋪速度或者中途停止。攤鋪速度應(yīng)根據(jù)所使用拌和機(jī)的產(chǎn)量、施工機(jī)械配套的情況及攤鋪層寬度、厚度來(lái)確定。
1.5 級(jí)配碎石碾壓
級(jí)配碎石的碾壓重點(diǎn)是對(duì)于嵌擠結(jié)構(gòu)的控制上,在保證壓實(shí)度達(dá)到標(biāo)準(zhǔn)要求的同時(shí),還要保證較小的壓實(shí)率。碾壓施工過(guò)程,振動(dòng)壓路機(jī)和重型輪胎壓路機(jī)作為主要的作業(yè)設(shè)備,鋼輪靜碾作為輔助設(shè)備,進(jìn)行三種壓路機(jī)交叉作業(yè),從而全面發(fā)揮各種壓路機(jī)的優(yōu)勢(shì)性能,達(dá)到最佳的作業(yè)效果。
級(jí)配碎石碾壓應(yīng)遵循先輕后重、先靜后振、先慢后快原則,嚴(yán)格控制壓路機(jī)在已經(jīng)完成或正在施工的路段上調(diào)頭或者急剎車(chē),從而能夠保證墊層表面不受到破壞。如果碾壓時(shí)施工路面水分蒸發(fā)過(guò)快,應(yīng)當(dāng)適量向路面灑水,但禁止灑水過(guò)多或水分過(guò)分集中。
1.6 橫向接縫
當(dāng)天的工作縫應(yīng)當(dāng)選擇留在大橋的搭板處和小橋的臺(tái)背處,對(duì)于段落較長(zhǎng)的工作縫需要總成橫向接縫,攤料機(jī)應(yīng)當(dāng)開(kāi)出攤料路面,攤料末端需由人工進(jìn)行攤平;對(duì)于壓路機(jī)壓實(shí)的路面末端,須在第二天對(duì)其進(jìn)行挖出,斷面垂直于路面,并在斷面上灑水處理后在進(jìn)行攤鋪新的混合料。
2 級(jí)配碎石施工過(guò)程注意事項(xiàng)及要求
(1)為防止集料水分的損失,應(yīng)采用搭棚儲(chǔ)存或用彩條布覆蓋。拌和機(jī)的投料計(jì)量應(yīng)準(zhǔn)確,定期檢查運(yùn)輸帶上各料倉(cāng)的投料數(shù)量,以確保投料精度。還應(yīng)根據(jù)具體混合料和集料含水量多少及時(shí)調(diào)整加水量。
(2) 鋪設(shè)級(jí)配碎石層采用滿(mǎn)鋪斷面形式,能夠方便內(nèi)部結(jié)構(gòu)排水,但這樣又給邊坡防護(hù)增加了難度,的級(jí)配碎石層容易受到雨水的沖刷而被掏空。研究結(jié)果表明,因道路表層損壞而流入基層內(nèi)部的水分很少,級(jí)配碎石層有足夠的孔隙率使流入其中的水分重新分布。亦即表示級(jí)配碎石層的水分重分布能力大于其排水能力。因此道路大修時(shí),要用土培路肩,以十米為間隔開(kāi)一米寬的排水口。
(3) 將拌和好的混合料盡快運(yùn)送到攤鋪現(xiàn)場(chǎng),運(yùn)輸過(guò)程中要對(duì)混合料做相應(yīng)的保護(hù)措施,減少水分損失。對(duì)碾壓含水量嚴(yán)格控制,依照確定的碾壓含水量值范圍及時(shí)碾壓。如果在碾壓過(guò)程中,出現(xiàn)表明缺水現(xiàn)象課適當(dāng)灑水潤(rùn)濕表面,然后在進(jìn)行碾壓。
(4)對(duì)于工作縫的要求,應(yīng)以避免縱向縫,減少橫向縫為原則。工作接縫嚴(yán)禁采用斜接縫,應(yīng)采用與路表面垂直的平接縫。在當(dāng)天若沒(méi)有完成直接縫,應(yīng)該在第二天開(kāi)工攤鋪新料之前,將末端的斜坡清除掉,并需要挖成橫向垂直斷面。
(5) 路基過(guò)渡段級(jí)配碎石應(yīng)符合的設(shè)計(jì)要求:路基過(guò)渡段級(jí)配碎石填料粒徑、級(jí)配及質(zhì)量應(yīng)該符合設(shè)計(jì)要求。碎石顆粒中片狀和針狀碎石含量應(yīng)不大于20%;易破碎和質(zhì)軟的碎石含量控制在10%以下。施工單位須每工班抽樣檢驗(yàn)1次顆粒級(jí)配、片狀和針狀碎石的含量、易破碎和質(zhì)軟碎石含量。
(6) 對(duì)于壓實(shí)度的檢查,應(yīng)將混合料中粗集料一并挖出,根據(jù)粗集料含量的最大干密度來(lái)計(jì)算其壓實(shí)度。施工過(guò)程中應(yīng)盡量避免出現(xiàn)配合比不準(zhǔn)確、原材料的質(zhì)量不合格、拌和的不均勻、攤鋪的不平整、碾壓的不密實(shí)、接縫不平整、高程不準(zhǔn)確等質(zhì)量通病,以及避免形成起皮、裂縫、松散、翻漿、彈簧、強(qiáng)度不合格等的質(zhì)量缺陷,從而能夠確保路面底基層工程質(zhì)量。
(7) 為應(yīng)對(duì)雨水對(duì)底基層以及施工材料的影響,每個(gè)施工點(diǎn)應(yīng)該備有滿(mǎn)足一天施工長(zhǎng)度的防雨水覆蓋材料。施工過(guò)程中必須確保沉降觀(guān)測(cè)管不能受到損壞,若有損壞,應(yīng)及時(shí)予以修復(fù),確保工程進(jìn)度。
3 小結(jié)
級(jí)配碎石有其良好的透水與擴(kuò)散應(yīng)力,以及承載過(guò)渡作用,并且材料來(lái)源廣泛,可以就地取材,便于原材料和混合料的加工,易于機(jī)械攤鋪操作,被廣泛應(yīng)用于修建高等級(jí)公路路面墊層。級(jí)配碎石墊層能夠兼顧路面結(jié)構(gòu)防排水功能,從而增強(qiáng)路面結(jié)構(gòu)強(qiáng)度性能,。如廣河、增從項(xiàng)目均設(shè)置了15cm~20cm厚級(jí)配碎石墊層(一般路段采用15cm,中、潮濕路段采用20cm),對(duì)提高路面的使用性能具有十分重要的意義。
參考文獻(xiàn)
[1] 王火明,招商局重慶交通科研設(shè)計(jì)院,重慶市;楊敏、符德省云南省公路科學(xué)研究院,云南 昆明; 王秀,重慶水電設(shè)計(jì)院,重慶市.粗集料強(qiáng)度和棱角性對(duì)級(jí)配碎石合成級(jí)配影響的試驗(yàn)研究.2013.
【關(guān)鍵詞】大型建筑工程;施工組織設(shè)計(jì);作用
大型建筑工程施工組織設(shè)計(jì)的目的是使大型建筑工程施工過(guò)程更為先進(jìn)、合理和高效,最終達(dá)到投資、工期、質(zhì)量目標(biāo)的統(tǒng)一【1】。在市場(chǎng)經(jīng)濟(jì)下,大型建筑工程的項(xiàng)目管理模式相應(yīng)發(fā)生了變化,而工程施工環(huán)境和技術(shù)環(huán)境的變化,使施工組織設(shè)計(jì)的地位和作用發(fā)生了根本變化【2】。本文為此通過(guò)理論與案例論述了施工組織設(shè)計(jì)在大型建筑工程施工中的作用。
1 施工組織設(shè)計(jì)在大型建筑工程施工中的作用與主要內(nèi)容
1.1 施工組織設(shè)計(jì)的作用
施工組織設(shè)計(jì)的作用旨在科學(xué)合理地組織各種可能的施工生產(chǎn)要求,項(xiàng)目開(kāi)工之前的模擬優(yōu)化組合配置,保證項(xiàng)目開(kāi)工后的施工活動(dòng)能有秩序、高效率、科學(xué)合理地進(jìn)行,從而達(dá)到優(yōu)質(zhì)、低耗、高效、安全和文明生產(chǎn)的目的。同時(shí)由于其具有承包合同的地位,其作用不限于施工,其具體表現(xiàn)在以下三方面:一是工程結(jié)算的依據(jù)。工程造價(jià)的一個(gè)重要特點(diǎn)是造價(jià)與施工方案有關(guān),同一項(xiàng)工程采用不同的施工方案,其工程量和造價(jià)都不一樣【3】。工程投標(biāo)報(bào)價(jià)往往是單價(jià)的套用和實(shí)際工程量的計(jì)算,則應(yīng)根據(jù)批準(zhǔn)的施工組織設(shè)計(jì)確定;二是施工組織設(shè)計(jì)是工程索賠的依據(jù)。三是監(jiān)理對(duì)象。施工組織設(shè)計(jì)應(yīng)用于施工全過(guò)程,集技術(shù)、經(jīng)濟(jì)、管理和合同于一體,是一份全面的施工計(jì)劃和合同文件。
1.2 施工組織設(shè)計(jì)的主要內(nèi)容
我國(guó)近年來(lái)推行的施工項(xiàng)目管理,帶動(dòng)了施工企業(yè)管理模式的成套改革。相應(yīng)地,施工組織設(shè)計(jì)應(yīng)從原來(lái)服務(wù)于施工準(zhǔn)備和現(xiàn)場(chǎng)施工,變?yōu)榉?wù)于施工項(xiàng)目管理的全過(guò)程,即服務(wù)于投標(biāo)承攬、簽定施工合同、施工準(zhǔn)備、現(xiàn)場(chǎng)施工和竣工驗(yàn)收各階段。根據(jù)這一前提,大型建筑工程施工企業(yè)應(yīng)編制兩類(lèi)施工組織設(shè)計(jì):一類(lèi)是投標(biāo)前編制的施工組織設(shè)計(jì)滿(mǎn)足編制投標(biāo)書(shū)和簽定施工合同的需要【4】;另一類(lèi)是施工前編制的施工組織設(shè)計(jì),滿(mǎn)足施工項(xiàng)目準(zhǔn)備和實(shí)施的需要。施工單位為了使投標(biāo)書(shū)具有競(jìng)爭(zhēng)力以實(shí)現(xiàn)中標(biāo),必須編制標(biāo)前設(shè)計(jì),對(duì)投標(biāo)書(shū)所要求的內(nèi)容進(jìn)行籌劃和決策,并附招投標(biāo)文件之中。標(biāo)前設(shè)計(jì)的水平既是能否中標(biāo)的關(guān)鍵因素,又是總包單位進(jìn)行分包招標(biāo)和分包單位編制投標(biāo)書(shū)的重要依據(jù)。它還是承包單位進(jìn)行合同談判、提出要約和進(jìn)行承諾的根據(jù)和理由,是擬定合同文本中相關(guān)條款的基礎(chǔ)資料。
2 加強(qiáng)大型建筑工程施工組織設(shè)計(jì)的措施
在市場(chǎng)經(jīng)濟(jì)下,項(xiàng)目法施工的運(yùn)行,施工項(xiàng)目管理的實(shí)踐和發(fā)展,要求施工組織設(shè)計(jì)具有科學(xué)指導(dǎo)施工活動(dòng)、統(tǒng)一作戰(zhàn)步調(diào)、提高勞動(dòng)效率、降低資源消耗、保證工程質(zhì)量和施工安全、實(shí)現(xiàn)文明生產(chǎn)、擴(kuò)大企業(yè)信譽(yù)等一系列服務(wù)性職能,以提高施工企業(yè)經(jīng)濟(jì)效益和業(yè)主的投資效益【5】。
2.1 確定施工組織設(shè)計(jì)原則
(1)編制施工組織設(shè)計(jì)人員優(yōu)先保證安全施工。在此基礎(chǔ)上,再研究經(jīng)濟(jì)核算、施工進(jìn)度等。(2)盡量采用先進(jìn)技術(shù)、先進(jìn)經(jīng)驗(yàn)提高勞動(dòng)生產(chǎn)率,降低成本。(3)各項(xiàng)技術(shù)措施要有針對(duì)性和可操作性。(4)強(qiáng)調(diào)管理,保證措施的指導(dǎo)性和完整性。(5)編制內(nèi)容不能與各種體系的文件產(chǎn)生矛盾。(6)施工組織設(shè)計(jì)應(yīng)在施工過(guò)程中不斷完善,對(duì)于效果明顯的內(nèi)容可在其它工程中推廣并做出永久更改,以利于持續(xù)改進(jìn)【6】。
2.2 優(yōu)化施工組織設(shè)計(jì)內(nèi)容
施工組織設(shè)計(jì)的內(nèi)容就是根據(jù)不同工程的特點(diǎn)和要求,根據(jù)現(xiàn)有的和可能創(chuàng)造的施工條件,從實(shí)際出發(fā),決定各種生產(chǎn)要素的結(jié)合方式。(1)建議結(jié)合項(xiàng)目法規(guī)的情況,結(jié)合以合同為中心的現(xiàn)場(chǎng)管理,強(qiáng)調(diào)合同和市場(chǎng)經(jīng)濟(jì)一體的觀(guān)念,將主要合同條文在施工組織設(shè)計(jì)中明確提出,同進(jìn)度、組織、管理、技術(shù)、成本串在一起。(2)選擇合理的施工方案是施工組織設(shè)計(jì)的核心,應(yīng)根據(jù)多年積累的大型建筑工程施工技術(shù)資源。(3)重視工程施工部署,根據(jù)當(dāng)前管理特點(diǎn)及分包情況、多部門(mén)責(zé)任劃分、分層管理、機(jī)械設(shè)備租賃、特種結(jié)構(gòu)施工委托、各階段的現(xiàn)場(chǎng)組織、穿插施工方案等都要做出明確的部署。細(xì)致的做好各項(xiàng)部署才能更好的分工參與行動(dòng),共同來(lái)實(shí)現(xiàn)組織設(shè)計(jì)中所制定的統(tǒng)一計(jì)劃目標(biāo)【7】。
2.3 施工組織做到簡(jiǎn)明扼要
我們建議采用簡(jiǎn)單有效的表達(dá)形式,建立施工生產(chǎn)要素形象配置組織系統(tǒng)圖模型和工程成本預(yù)控模型,建立健全施工技術(shù)模塊庫(kù),應(yīng)用模塊集合技術(shù),基本實(shí)現(xiàn)內(nèi)容圖表化,文本標(biāo)準(zhǔn)化,以便工程項(xiàng)目施工管理指揮人員深刻領(lǐng)會(huì)認(rèn)真執(zhí)行。這種設(shè)計(jì)更符合客觀(guān)實(shí)際更能科學(xué)地指導(dǎo)施工實(shí)際,根據(jù)具體工程施工項(xiàng)目特定條件,通過(guò)信息轉(zhuǎn)換互聯(lián)網(wǎng)絡(luò)技術(shù)處理,選擇適用技術(shù)模塊進(jìn)行代化組合,形成實(shí)施性施工組織設(shè)計(jì),減少重復(fù)勞動(dòng),變重復(fù)勞動(dòng)為創(chuàng)造性勞動(dòng),變習(xí)慣思維為創(chuàng)新思維。
3 施工組織設(shè)計(jì)在大型建筑工程施工中的應(yīng)用-案例分析
3.1 工程概況
某某大型建筑工程地處我國(guó)華東錢(qián)塘江的支流上,為一發(fā)電為主兼顧灌溉,防洪的水利樞紐工程。在壩型比較階段,比較了砼重力壩和粘土心墻砂殼壩兩個(gè)方案。壩高81m,壩頂長(zhǎng)度370m,設(shè)計(jì)正常高水位為100m,校核洪水位為102m,大壩典型斷面見(jiàn)圖II-II。大壩屬于二級(jí)建筑物。溢洪道布置在壩址一公里的左岸凹口處,為開(kāi)敞正槽式,此頂高程為92m,總寬度64m,出口采用差動(dòng)式鼻坎挑流效能。導(dǎo)流洞為城門(mén)洞型,開(kāi)挖寬度8.8m,高度13.2m,開(kāi)挖斷面84.72m2。隧洞長(zhǎng)650m,進(jìn)口高程25.0m,出口高程23.7m。
3.2 開(kāi)挖方法
采用鉆爆法全斷面開(kāi)挖,由于地質(zhì)條件比較好,機(jī)械化程度高,擬采用全斷面微差爆破一次成型,周邊采用光面爆破。鉆孔:采用鉆孔臺(tái)車(chē),崩落孔和周邊孔鉆孔直徑40mm,掏槽孔鉆孔直徑45mm。裝藥:采用裝藥臺(tái)車(chē)。爆破:采用楔形掏槽,非電毫秒微差起爆網(wǎng)絡(luò),一次性爆破。散煙:采用軸流式雙向通風(fēng)機(jī)安全檢查處理:利用裝藥臺(tái)車(chē),人工排除危石、浮石,必要時(shí)進(jìn)行噴錨支護(hù)。裝渣:采用1.7m3裝載機(jī)裝7.0T自卸汽車(chē)運(yùn)輸。
3.3 主要參數(shù)
炮孔布置:根據(jù)經(jīng)驗(yàn)及公式計(jì)算。掏槽孔采用楔形掏槽,布置8個(gè)孔,孔徑45mm;周邊孔布置間距50cm,根據(jù)周長(zhǎng)共布置80個(gè),線(xiàn)裝藥密度300g/m;崩落孔布置67個(gè)。計(jì)算布孔155個(gè)實(shí)際布孔:中心位置布置楔形掏槽孔8個(gè);周邊布置光爆孔80個(gè);崩落孔間排距根據(jù)1.3~1.5m不等布置,實(shí)際布置炮孔60個(gè)。共布孔148個(gè)。循環(huán)作業(yè):根據(jù)爆破孔布置,循環(huán)作業(yè)時(shí)間12h,循環(huán)進(jìn)尺2.4m。主要作業(yè)項(xiàng)目如下:裝藥:0.5h;爆破、散煙、安全檢查:1.0h;裝渣機(jī)械進(jìn)出工作面:0. 5h;鉆車(chē)進(jìn)出工作面:0. 5h;鉆孔:7.0h;出渣:2.5h。
總之,施工組織設(shè)計(jì)是工程項(xiàng)目管理策劃內(nèi)容的具體反映,是施工企業(yè)多年來(lái)施工經(jīng)驗(yàn)的總結(jié)和發(fā)展。在市場(chǎng)經(jīng)濟(jì)下,必須擴(kuò)大深度和范圍,加強(qiáng)技術(shù)積累,并建立監(jiān)督制度,使施工組織設(shè)計(jì)方案順利實(shí)施。
參考文獻(xiàn):
[1]編寫(xiě)組.建筑施工手冊(cè)[M].北京:中國(guó)建筑工業(yè)出版社,2004.
[2]尹貽林.工程造價(jià)計(jì)價(jià)與控制[M].中國(guó)計(jì)劃出版社,2006.
[3]齊寶庫(kù),黃如寶.工程造價(jià)案例分析[M].中國(guó)計(jì)劃出版社,2005.
[4]何書(shū)武.科學(xué)的施工組織設(shè)計(jì)確定合理的投標(biāo)報(bào)價(jià)[J].山西建筑,2006,32(22):77-79.
[5]張振良.淺論建筑工程項(xiàng)目施工管理的創(chuàng)新[J].廣東建材,2005(10):97-99.
[6]吳孝勇.項(xiàng)目施工管理的創(chuàng)新方案[J].工程建設(shè)與檔案,2005(4):282-283.
[7]滕澤洪.淺談高層建筑施組織設(shè)計(jì)中的施工防火[J].建筑安全,2002,20(1):67-68.
關(guān)鍵詞:鐵路工程;大跨徑橋梁;施工技術(shù);基礎(chǔ)工程;索塔工程
一、鐵路工程大跨徑橋梁工程施工技術(shù)
鐵路工程中的大跨徑橋梁工程是一項(xiàng)耗時(shí)長(zhǎng)、難度高的施工項(xiàng)目,其中包括很多類(lèi)型的橋梁建設(shè),例如斜拉橋、懸索橋、拱橋等。大跨徑橋梁的工程質(zhì)量直接影響到橋梁投入使用后的情況,對(duì)交通運(yùn)輸有著較大的影響。因此,施工技術(shù)在橋梁工程中的操作發(fā)揮,是保證大跨徑橋梁工程質(zhì)量的關(guān)鍵所在,也是確保整個(gè)鐵路工程整體的施工質(zhì)量。下面我們將對(duì)鐵路工程大跨徑橋梁工程中具體的施工技術(shù)進(jìn)行詳細(xì)的介紹:
1、基礎(chǔ)工程施工技術(shù)?;A(chǔ)工程施工技術(shù)是整個(gè)工程施工中的關(guān)鍵內(nèi)容,是大跨徑橋梁工程建設(shè)的基礎(chǔ),對(duì)整個(gè)工程起到鋪墊的作用?;A(chǔ)工程施工技術(shù)中要掌握兩個(gè)施工要點(diǎn),目的在于可以提高工程的質(zhì)量水平。
①承臺(tái):承臺(tái)是樁與柱或者墩之間聯(lián)系的部分,在基樁頂部設(shè)置的鋼筋混凝土平臺(tái)。主要是為承受由墩身傳遞出的荷載。在對(duì)承臺(tái)的建設(shè)中,要注意承臺(tái)是要設(shè)置在深水中,要被水全部覆蓋。這樣承臺(tái)除了承受墩身的重量外,還要承受來(lái)自水帶來(lái)巨大的壓力。這樣明顯加大了承臺(tái)的施工難度。目前,承臺(tái)的施工建設(shè)是用鋼套箱,利用吊裝的方式,可以在水下完成整套的承臺(tái)建設(shè)施工。需要注意的是承臺(tái)的地基建設(shè),由于水中的土質(zhì)較軟,不利于承臺(tái)的固定,也很難達(dá)到載重標(biāo)準(zhǔn),所以要將護(hù)筒放置于更深的地下,以保證承臺(tái)的穩(wěn)固性。
②沉井:沉井是一種呈井筒狀的結(jié)構(gòu)物,是靠自身的重力作為境內(nèi)挖土的重要手段。通常是作為承臺(tái)建設(shè)中的地基。沉井的作用非常關(guān)鍵,承臺(tái)的建設(shè)需要一個(gè)牢固的地基作為水下的支撐,否則很難承受橋梁墩身強(qiáng)大的荷載。按照平面形狀分,沉井大多分為圓心沉井、矩形沉井和圓端形沉井,形狀對(duì)稱(chēng),這樣才能做到受力合理,并且施工操作方便簡(jiǎn)單。
③地下連續(xù)墻:地下連續(xù)墻的起源較早,主要是在地面上采用挖槽機(jī)械挖掘出一條深槽通道。需要注意的是要在槽的表面建立起鋼筋混凝土墻壁,為了避免滲水等問(wèn)題的發(fā)生。還要對(duì)施工的過(guò)程進(jìn)行嚴(yán)格的監(jiān)控,保證施工流程的正確和規(guī)范。地下連續(xù)墻具有振動(dòng)小、墻體荷載性能強(qiáng)、施工速度快等特點(diǎn)。
2、索塔工程施工技術(shù)。索塔是工程施工中的一項(xiàng)重要的施工技術(shù),在索塔的過(guò)程中,要根據(jù)不同的索塔類(lèi)型,采取不同的施工技藝來(lái)進(jìn)行工程的施工建設(shè)。下面我們將以混凝土索塔與鋼索塔為例,闡述索塔類(lèi)型與施工技術(shù)之間的關(guān)系。
①混凝土索塔:斜拉橋的索塔多為混凝土塔。在索塔的過(guò)程中索塔用來(lái)錨固拉索,要配備電梯等相應(yīng)的施工設(shè)備,能夠在施工的過(guò)程中作為輔助道具,但卻能起到很好的作用。還要配備塔吊,作為模板的爬升裝置。并且要為塔柱設(shè)置支撐桿增加塔身的穩(wěn)固性,避免在施工的過(guò)程中發(fā)生塔身變形等情況。在具體的橫梁施工當(dāng)中,應(yīng)采用分塊施工的方法,保證施工的安全進(jìn)行。
②鋼索塔:吊橋的索塔通常為鋼索塔。首先要根據(jù)實(shí)際的施工需要準(zhǔn)備相應(yīng)的施工設(shè)備和建筑材料,在進(jìn)行施工之前,要對(duì)索塔進(jìn)行初步的加工,進(jìn)行檢測(cè)是否達(dá)到施工標(biāo)準(zhǔn);其次要完成吊裝、接高、連接等施工程序;最后,施工任務(wù)完成,檢查工程的施工質(zhì)量。
3、上部結(jié)構(gòu)施工技術(shù)。在完成基礎(chǔ)工程施工與索塔工程施工之后,將要進(jìn)行的是上部結(jié)構(gòu)的施工。這一施工環(huán)節(jié)也有兩點(diǎn)要 注意的技術(shù)要點(diǎn),我們進(jìn)行詳細(xì)的講解:
①梁段:在梁段施工過(guò)程中,常用混凝土澆注施工方法包括懸臂施工法、就地澆注法、頂推施工法、逐孔施工法等。根據(jù)大跨徑橋梁施工的實(shí)際情況,梁段結(jié)構(gòu)施工中,常常采用混凝土箱梁法和鋼管支架法,后者作為施工輔助方法。箱梁施工過(guò)程中,為避免裂縫出現(xiàn),確保施工效果,一般采用分塊澆注的方式,但整體式箱梁也可以采用整體箱梁澆注方式,以促進(jìn)梁段施工效果提升。
②斜拉索:橋梁運(yùn)營(yíng)過(guò)程中,斜拉索一般承受較大牽引力,根據(jù)這種情況,施工中可以采用梁段牽引工藝或張拉施工工藝。具體來(lái)說(shuō),開(kāi)展施工時(shí),采用橋面吊機(jī)與梁端牽引導(dǎo)向裝置一體化的設(shè)計(jì)方案,從而達(dá)到減小懸臂前端荷載大小的目的,進(jìn)而保證斜拉索彎曲半徑符合要求,有利于提高橋梁工程施工效果。
4、質(zhì)量控制技術(shù):工程施工中的施工技術(shù)固然重要,但是工程建設(shè)中的質(zhì)量控制技術(shù)也同樣重要。首先,在工程施工建設(shè)之前,要對(duì)工程進(jìn)行整體的設(shè)計(jì)與規(guī)劃,根據(jù)實(shí)際的施工環(huán)境情況,在不同的路段區(qū)域采用不同的施工技術(shù)進(jìn)行施工等等都要做出明確的標(biāo)識(shí);其次,要對(duì)工程建設(shè)中需要的機(jī)械設(shè)備進(jìn)行準(zhǔn)備,施工中的一些環(huán)節(jié)需要何種機(jī)械設(shè)備進(jìn)行操作,以及對(duì)操作人員的操作水平考察都要進(jìn)行詳細(xì)的了解;最后,工程驗(yàn)收是工程建設(shè)中的最后步驟,主要是對(duì)工程質(zhì)量進(jìn)行檢驗(yàn),確保工程建設(shè)符合國(guó)家的安全標(biāo)準(zhǔn),并且能夠順利的投入使用。
三、影響鐵路工程大跨徑橋梁工程的不確定因素及質(zhì)量控制方法
1、結(jié)構(gòu)參數(shù)控制
1.1結(jié)構(gòu)構(gòu)件截面尺寸。任何施工都可能存在截面尺寸誤差,驗(yàn)收規(guī)范中也允許出現(xiàn)不超過(guò)限值的誤差,而這種誤差將直接導(dǎo)致截面特性誤差,從而直接影響結(jié)構(gòu)內(nèi)力、變形等的分析結(jié)果。
1.2結(jié)構(gòu)材料彈性模量。結(jié)構(gòu)材料彈性模量和結(jié)構(gòu)變形有直接關(guān)系,對(duì)通常遇到的超靜定結(jié)構(gòu)來(lái)講,彈性模量對(duì)結(jié)構(gòu)分析結(jié)果影響更大。但施工成品構(gòu)件的彈性模量總與設(shè)計(jì)采用值不完全一致,所以,在施工過(guò)程中要根據(jù)施工進(jìn)度作經(jīng)常性的現(xiàn)場(chǎng)抽樣試驗(yàn)。
2、溫度變化控制
溫度是影響主梁撓度的最主要的因素之一。日溫度變化比較復(fù)雜,尤其是日照作用和驟變溫度,會(huì)引起主梁頂?shù)装鍦囟炔?,使主梁發(fā)生撓曲,同時(shí),也會(huì)引起墩身偏移。季節(jié)溫差對(duì)主梁撓度的影響比較簡(jiǎn)單,其變化是均勻的,可采集各節(jié)段在各施工階段的溫度,輸入計(jì)算機(jī)計(jì)算撓度。
3、材料收縮、徐變控制
對(duì)混凝土橋梁結(jié)構(gòu)而言,材料收縮、徐變對(duì)結(jié)構(gòu)內(nèi)力、變形有較大的影響,這主要是由于施工中混凝土普遍存在加載齡期短、各階段齡期相差大等引起的??刂浦幸枰哉J(rèn)真研究,以期采用合理的、符合實(shí)際的徐變參數(shù)和計(jì)算模型。
4、施工及監(jiān)測(cè)控制
監(jiān)測(cè)包括結(jié)構(gòu)溫度監(jiān)測(cè)、應(yīng)力監(jiān)測(cè)、變形監(jiān)測(cè)等,是橋梁施工控制最基本的手段之一。因測(cè)量?jī)x器、儀器安裝、測(cè)量方法、數(shù)據(jù)采集、環(huán)境情況等存在誤差,所以,結(jié)構(gòu)監(jiān)測(cè)總是存在誤差。該誤差一方面可能造成結(jié)構(gòu)實(shí)際參數(shù)、狀態(tài)與設(shè)計(jì)或控制值吻合較好的假象,也可能造成將本來(lái)較好的狀態(tài)調(diào)整得更差的情況。
三、結(jié)束語(yǔ)
總而言之,大跨徑橋梁工程的建設(shè)對(duì)鐵路工程有著重大的意義。過(guò)硬的施工技術(shù)是大跨徑橋梁工程質(zhì)量的保證。要將每一個(gè)施工環(huán)節(jié)中的施工要點(diǎn)掌握透徹,才能夠在工程的建設(shè)施工當(dāng)中做到保質(zhì)保量。工程單位要對(duì)施工人員的施工技術(shù)進(jìn)行培訓(xùn),并且提升個(gè)人素質(zhì),有利于工程的施工建設(shè),是加強(qiáng)施工隊(duì)伍凝聚力的有效辦法,也為鐵路工程大跨徑橋梁工程的施工創(chuàng)造良好的施工條件。